Description: Rooftop make-up air unit replacements for 7 condominium buildings. Work included demolition and removal of existing units and duct shafts supplying make up air to corridor hallways. Special care was taken during removal and construction because condominiums were occupied.
Highlights:
- All work done in occupied buildings with minimal downtime of services
- Logistics involving a crane lift in downtown Toronto including downtime of TTC services, temporary removal of street car power lines, and closures of roadways
- Coordination of safe removal of existing rooftop units and delivery of new make-up air units in a crucial timeframe
Engineer: VRM Consulting Engineers