Description: This project was carried out under Group 92’s complete administration. A major boiler upgrade for the institution, the project has allowed Niagara College to increase heating efficiencies while having the assurance of a low maintenance system. At a routine inspection, the VP of De Dietrich Boiler Systems offered his admiration of the work performed by Group 92 regarding the installation.
Highlights:
- High efficiency system
- Complex demolition and install considerations
- Adhered to fast tracked project schedule
Engineer: Vanderwesten Rutherford Mantecon Consulting Engineers