Description: Construction involves a large and critical area of Terminal 3’s West End Process area. Such aspects include alterations to the departures, arrivals and customs administration areas. In meeting project goals, the unique logistics accessing security sensitive areas was accomplished through integrated communications between the general contractor, owner and other stakeholders involved. The above mentioned considerations hinged around a demanding schedule requiring a phased turnover to accommodate occupancy.
Highlights:
- Work in highly secured administration areas.
- HVAC utilizing existing systems
- Upgrading a Johnson Controls System tied into an existing network
- Utilizing existing chilled and heating water infrastructure for new fan coil units
Engineer: SAII + MMM