Testimonials

“We have been very impressed with the quality of work, timely response, excellent communication and job efficiency. The level of professionalism and overall interest in meeting Brock’s changing scope and requirements has been refreshing.”

Group 92’s overall quality in the on site applications, co-ordination and administrative responsiveness to all challenges presented in the project reinforce my views that l consider Group 92 to be one of the premiere mechanical contractors in the region and would unequivocally recommend them for any future work.


Read The Full Reference Letter (PDF)

André Hebert, Senior Project Manager, Stucor

It is my pleasure to be able to recommend Group 92 Mechanical Inc.
For several years, Group 92 has worked for Constellation Brands Canada as a
subcontractor on facility expansion projects in Niagara Falls.

 

Group 92 understands that the timeline for our projects are critical because substantial
completion is always required in time for harvest. They have never failed to meet a
deadline when working for us. In addition, the staff of Group 92 has always worked in a
safe and professional manner.


Read The Full Reference Letter (PDF)

 

Brad Wells, P. Eng, Constellation Brands Canada, Inc.

Vanderwesten Rutherford Mantecon Inc. has had the pleasure of working with Group 92 Mechanical Inc. on several occasions and on projects of varying size and complexity. Whether it was the restrictive and demanding work environment of the McMaster University Medical Centre, the difficulty of performing a boiler upgrade on an operational campus such as the Welland Campus of Niagara College of Canada, or, most recently, a complete Mechanical renovation (including Process Venting) under a very tight 5-month schedule at Universal Resource Recovery Welland Recycling and Compost Facility (a 120,000 square foot indoor composting facility), Group 92 has met each challenge, exceeded expectations, and proven to be professional and highly capable.


Read The Full Reference Letter (PDF)

View the Project Highlights.

Tony Mantecon, P. Eng., Vanderwesten Rutherford Mantecon Inc.

Group 92 is the mechanical contractor for the Hamilton Health Science, General Hospital HRLMP Clinical Office Research & Trials Laboratory Expansion. Execution of the project means working in an operating hospital environment. Extreme attention to coordination, quality and schedule, is required in order to provide a transparent delivery. Group 92 is responsible to supply and install new HVAC Unit and all associated piping and sheet metal.

 

Although the timeline for completion was extremely tight, the project was completed in just three months to satisfy the Owner’s requirements.  The mechanical contractor coordinated work effectively with us as well as other trades. Workmanship on site was very good. Project site personnel had an excellent understanding of the project and were
proactive in identifying downstream problems so that we could work together to resolve them before they would have a negative impact on the work.


Read The Full Reference Letter (PDF)

Steven Moffat, VP Industrial Automotive, Alberici Constructors