Portfolio Category: Manufacturing

Hennegis Automotive

This project involved the relocation of an existing Automotive Plant from Oakville, to Burlington, Ontario. Mechanical systems included, chilled water, process cooling water, compressed air, natural gas, potable water systems, sanitary and process sanitary. This project was extremely fast paced from design to build in six months. Notably the project was a collaborative, Group 92...
Read more

Minute Maid Facility – Peterborough

Description: This project was completed in April 2006. The project consisted of the complete plumbing and HVAC construction of a 100,000 square foot chilled warehouse for Minute Maid products, including a 3,000 square foot office area.

Highlights:

  • The project was completed on a design / build basis using a team approach between the engineer, Alberici...
Read more

Universal Resource Recovery

Description: The above project involved the complete Mechanical renovation of a now-defunct 120,000 square foot Atlas Steel building to facilitate the creation of an indoor Composting Facility. The centre-piece of this project was the installation of a Process Venting system to handle the fumes associated with the composting process.

Highlights:

  • Installation of large diameter duct...
Read more