Niagara College Boilers

  • ncb2
  • ncb1
  • ncb3
  • ncb4

Description: This project was carried out under Group 92’s complete administration.  A major boiler upgrade for the institution, the project has allowed Niagara College to increase heating efficiencies while having the assurance of a low maintenance system.  At a routine inspection, the VP of De Dietrich Boiler Systems offered his admiration of the work performed by Group 92 regarding the installation.

Highlights:

  • High efficiency system
  • Complex demolition and install considerations
  • Adhered to fast tracked project schedule

Engineer: Vanderwesten Rutherford Mantecon Consulting Engineers

Comments are closed.